Getting a job done is a stack of different kinds of work unfolding over time. Automating the core doesn't erase that work — it redistributes it: the build shrinks, but specifying, verifying, and coordinating grow. Each chart stacks the work types over time; the area underneath is the cost to get the job done. Tune the dials and watch the shape — and the total — change.